Before startup
Inspect guards, emergency controls, visible cables, hoses, lubrication points and the working area before energizing the machine.
Use the maintenance centre to prepare routine checks, collect useful fault information and request the correct technical or spare-parts support.

Use the machine manual and model-specific maintenance schedule as the controlling document. The points below are a practical support checklist, not a substitute for them.
Inspect guards, emergency controls, visible cables, hoses, lubrication points and the working area before energizing the machine.
Monitor water, air, cooling, tool condition, conveyor movement and any unusual vibration, sound or alarm information.
Remove processing residue, clean the relevant areas and record any items that need inspection before the next run.
Follow the approved schedule for lubrication, alignment, fasteners, consumables, filters and safety equipment.
A clear technical request reduces unnecessary back-and-forth and helps the team identify the right inspection, adjustment or replacement guidance.
